THE Comet 1 project

We are building a replica full-scale fuselage of the 1949 De Havilland Comet 1.

EPISODE 1

INTRODUCTION
We're building a replica de Havilland Comet 1 fuselage from scratch. In this documentary, we'll explain why we're building it and why the de Havilland Comet 1 was so important to modern commercial aviation.

EPISODE 2

DRAWINGS AND JIGS
In Episode 2 of the de Havilland Comet 1 Project, we show what some of the technical drawings look like, build the plywood jig, and start cutting metal.

EPISODE 3

SKINS, RIVETING, AND WINDOWS
In Episode 3 of the de Havilland Comet 1 Project, we skin all of the nose, called Section 1. We also build the windows and the cantilevered still stand. For the first time, Section 1 is brought outdoors into the sunlight.

EPISODE 4

FLOOR, NOSECAP, AND YOKES
In Episode 4 of the de Havilland Comet Project, we create the floor panels for Section 1, create the nose cap, fabricate the control columns and wheels, and paint the interior windscreen structure.

EPISODE 5

MOVING, KEEL PARTS, AND BULKHEADS
In Episode 5 of the de Havilland Comet 1 Project, we move Section 1 to a new home. We also transition from hand-cutting of parts to CNC-cut parts, with far greater precision. Next, we assemble the bulkheads, preparing them as the basis for the next phase of the project.

EPISODE 6

STEEL STAND, LONGERONS, AND SECTION 1 LIFT
In Episode 6, we build the steel floor stand, drill all six longerons, create the cradle to hold Section 1, and lift Section 1 onto Section 2. For the first time, Sections 1 and 2 are bolted together, and some new members join the team.

EPISODE 7

MOVING, KEEL PARTS, AND BULKHEADS
In Episode 7 of the de Havilland Comet 1 project, we build the floor beams, keel frames, and floor panels. We also install all seventeen keel stringers, prepping the keel for skinning.

EPISODE 8

RIGHT-SIDE KEEL SKINS
In Episode 8 of the de Havilland Comet 1 Project, we skin the lower keel and the right aft keel sections.